New PostErstellt: 15.09.21, 04:47  Betreff: Installation Method of KBK Cranes Track and Rail  drucken  Thema drucken  weiterempfehlen Antwort mit Zitat  

KBK track is composed of track, suspension equipment, trolley and some functional parts. Mainly used for lightweight, high-frequency material transfer, with a maximum lifting capacity of 2 tons crane machine.


KBK track and rail installation method

1.Installation method of KBK track:
KBK track installation generally chooses steel structure beams and concrete precast beams.
The concrete precast beams need to reserve embedded holes so that the bolts can pass through the bolts during the installation process, or the bolts will wear out.
The primary installation methods include pressure plate fixing, hook screw fixing, welding and bolt joint fixing, etc.
When the first method is selected, the required rigidity is required.
Single or double holes can be made according to the stress conditions of each pressure plate.
2.Installation of KBK rail standard parts:
Rail suspension is also an important standard component, usually located on the upper suspension beam or rail suspension frame, and can be installed with two long nuts with spherical joints.
It should be noted that all bolts must be tightened according to the regular torque when connecting. This allows the light rail to float.
3.After the boom is installed, the rails need to be connected.
Connecting bolts can use hexagonal socket wrenches with universal joints.
When connecting, the bolts should be tightened evenly according to the regular torque. If the ends of the bolt joints are not tightened evenly, the guide rail will bend.
When several tracks are suspended, it is necessary to cross a horizontal plane, if it is a straight line. Even if there is an error, the horizontal height should not exceed 10mm.
4.Next step, it is necessary to install and run trolleys, cable cars and built-in buffers on the track. In order to install smoothly, it is necessary to drill holes on the top of the track, and close the end of the rail with the buffer end cover, and use the bolts on the ice crystal end cover according to the regular torque to ensure the safe operation of the trolley.
Installation Method of KBK Cranes Track and Rail
nach oben
goal ken
Gast
New PostErstellt: 15.09.21, 12:16  Betreff: Re: Installation Method of KBK Cranes Track and Rail  drucken  weiterempfehlen Antwort mit Zitat  

Your blog is meaningful, I have read many other blogs but your blog has persuaded me, I hope in the coming time you will have more great blogs to share with readers. https://candycrushsoda.co
nach oben
lucasnoah
Mitglied

Beiträge: 37

New PostErstellt: 15.09.21, 21:27  Betreff: Re: Installation Method of KBK Cranes Track and Rail  drucken  weiterempfehlen Antwort mit Zitat  

I wanted to thank you for this great read!! I definitely enjoying every little bit of it I have you bookmarked to check out new stuff you post.Canada Visa Questions

nach oben
Benutzerprofil anzeigen Private Nachricht an dieses Mitglied senden
Sortierung ndern:  
Anfang   zurück   weiter   Ende
Seite 1 von 1
Search

powered by carookee.com - eigenes profi-forum kostenlos

Layout © subBlue design