Sparrows Group secures largest ever non-energy contract

Anfang   zurück   weiter   Ende
Autor Beitrag
taitai
Gast
New PostErstellt: 08.03.23, 03:13  Betreff: Sparrows Group secures largest ever non-energy contract  drucken  weiterempfehlen Antwort mit Zitat  

Pelloby has installed a 4t overhead crane at a galvanising facility in Stoke-on-Trent, UK, to replace the existing overhead crane at the plant.

4t overhead crane

The customer, Stoke Galvanising, required a new crane that would allow them to continue lifting products in and out of hot-dip galvanizing baths as part of daily operations.

The 11.5m-long, single girder overhead crane needed to support two hoists and run on the plant’s existing gantry supporting steelwork. It spanned the whole width of the warehouse, and provides a total lift height of 5.5m.

The crane was supplied with an additional coating of paint, and was made to measure to exactly fit the dimensions of the plant and existing gantry, to ensure longevity in the harsh industrial environments of the galvanising operations.

The two chain hoists are connected by a rigid galvanised tie bar, which runs along the length of the beam. The system is controlled by an independent pendant with a selector switch, for operating both hoists and the long-travel motion.

As well as designing and installing the crane, Pelloby also removed the existing crane and completed final testing and commissioning.

Sparrows Group secures largest ever non-energy contract
nach oben
Sortierung ndern:  
Anfang   zurück   weiter   Ende
Seite 1 von 1
Search

powered by carookee.com - eigenes profi-forum kostenlos

Layout © subBlue design