Retinoblastom - Forum

 
Sie sind nicht eingeloggt.
LoginLogin Kostenlos anmeldenKostenlos anmelden
BeiträgeBeiträge MembersMitglieder SucheSuche HilfeHilfe
VotesUmfragen FilesDateien CalendarKalender BookmarksBookmarks
The overhead crane was installed at a motorcycle production facility at Bin Qasim, Karachi

Anfang   zurück   weiter   Ende
Autor Beitrag
taitai
Gast
New PostErstellt: 26.02.24, 10:40  Betreff: The overhead crane was installed at a motorcycle production facility at Bin Qasim, Karachi  drucken  weiterempfehlen Antwort mit Zitat  

We have completed 1 order for double girder overhead crane to Pakistan. This is a 3 ton overhead crane with ABM and Siemens Motors.

The overhead crane was installed at a motorcycle production facility at Bin Qasim, Karachi.

The crane will service the plant as it works double shifts to supply 44,000 units.

Double Girder Overhead Crane Parameters

Rated capacity: 3t
Span: 16.06m
Lifting height:11m
Power supply: 380V 50Hz 3P
Pendant control and remote control
ABM motor for hoist
Siemens motor for crane travelling
Note:

Our offer includes supply of complete crane.
Rails and bus bar system are not included, and can be provided upon client’s request.
Installation service is not included and can be provided upon client’s request.
3 ton Double Girders Gantry Crane Finished Installation for reference
During the design and manufacturing process, we fully considered the local working environment and climatic conditions of Pakistan, ensuring that the crane can adapt to harsh environments such as high temperature and dustiness, and always maintain stable performance. At the same time, we use high-strength steel and advanced welding technology to ensure the structural strength and durability of the crane.

The crane’s double-girder bridge structure ensures excellent stability and load-bearing capacity while working. Its maximum lifting capacity is 3 tons, which can easily handle the handling tasks of various heavy-duty components in the motorcycle manufacturing process. In addition, the crane is equipped with advanced control systems and safety devices, such as overload protection, limit switches, etc., ensuring safety and reliability during operation.

In terms of installation, since the climate conditions and working environment in Karachi, Pakistan are different from where our manufacturing plant is located, some adaptations need to be made during the installation process. We dispatched a professional technical team to the site and worked closely with local engineers and technicians to complete the installation of the crane. During the installation process, the team also took into account local safety regulations and operating procedures to ensure compliance and safety throughout the installation process.

3 ton Double Girders Gantry Crane Finished Installation for reference-wire rope hoist
Due to the large size and weight of the crane, there may be some minor deviations or errors during installation. During the trial operation, we found that some movements of the crane were not smooth enough and there were some minor stucks or vibrations. In order to solve this problem, our technical team conducted a detailed inspection and analysis of the crane’s structure, found out the root cause of the problem, and made precise adjustments and optimizations to ensure the crane’s smooth and smooth operation.

In addition, during the trial operation, we also noticed the impact of the local working environment and climatic conditions on the crane. For example, the high temperatures in Karachi, Pakistan, may have a certain impact on the crane’s lubrication system and cooling system. Therefore, our technical team conducted special inspections and adjustments on the crane’s lubrication and cooling system to ensure that it can operate normally in high-temperature environments.

Finally, we also noted that local operators may not be familiar enough with crane operation and maintenance. In order to ensure the safe and stable operation of the crane, our technical team provides local operators with detailed operational training and maintenance guidance to help them better master the operation and maintenance skills of the crane.

The actual application of the crane in the motorcycle manufacturing plant in Karachi, Pakistan is very ideal and has been highly praised and recognized by customers. This further proves the competitiveness of our product quality and technical strength in the international market.

Technical Specifications
Rated capacity t 3
Lifting height m 11
Span m 16.06
Speed Trolley traveling speed m/min 5.0~20 (Inverter control)
Bridge traveling speed 10.0~40 (Inverter control)
Main hook lifting speed 0.8/5.0 (Double speed)
Working class / FEM 2M
Power supply V/Hz 380/3/50
Trolley traveling power KW 2*0.25
Bridge traveling power 2*0.75
Hoisting power 0.45/3.2
Total power 5.65
Total Weight t 7.1
Max wheel load KN 36.8
Protection class / IP55
Insulation grade F
Ambient temperature / -20℃ ~ +40℃
Electrics (contactors) / Schneider contactors
Hook type / With spring loaded Safety Latch and should have 360° rotation.
Steel Material / Q235B
Color / Bright yellow
Paint / Galvanized
Anti-collision system / Included
Phase protection relays / Included
Limit switch / Included
Voltage Low Protect device / Included
Emergency stop action / Included
Ground fault protection / Included
Short-circuit protection / Included
Over-heating protection / Included
Power-off protection / Included
Over-current protection / Included
Overload protector / Included
Top Quality Buffer / Included
Cross Power / C Track Festoon Cables
Country of origin / China
Recommended Rail Specifications:
Type Top Width(mm) Bottom Width(mm) Height(mm) Weight(kg/m)
P24 51 92 107 24.95
The overhead crane was installed at a motorcycle production facility at Bin Qasim, Karachi
nach oben
Sortierung ndern:  
Anfang   zurück   weiter   Ende
Seite 1 von 1
Search

powered by carookee.com - eigenes profi-forum kostenlos

Layout © subBlue design