Retinoblastom - Forum

 
Sie sind nicht eingeloggt.
LoginLogin Kostenlos anmeldenKostenlos anmelden
BeiträgeBeiträge MembersMitglieder SucheSuche HilfeHilfe
VotesUmfragen FilesDateien CalendarKalender BookmarksBookmarks
How to replace and install the electric hoist rope guide of a single beam crane

Anfang   zurück   weiter   Ende
Autor Beitrag
tai tai
Gast
New PostErstellt: 26.10.21, 04:47  Betreff: How to replace and install the electric hoist rope guide of a single beam crane  drucken  weiterempfehlen Antwort mit Zitat  

The rope guide on the single-beam crane electric hoist is also called the rope arranging device. It is an accessory that is relatively easy to damage, but many customers do not know how to replace the rope guide. The editor will briefly introduce the replacement of the electric hoist rope guide. The method steps are for your reference Crane for sale .

Replacement method of electric hoist rope guide
The replacement of the rope guide must be matched with the electric hoist. The electric hoist produced by some big-name factories cannot use the conventional rope guide. Please pay attention to communicate with us when purchasing. To replace the rope guide, first turn off the electric hoist and remove the wire rope. After removing the 6-point screw of the rope guide, the rope guide can be removed along the wire rope. During this period, be sure to arrange the wire rope. Install the rope guide in the groove in the future to avoid the possibility of squeezing the rope guide again if the wire rope is not in the groove after the machine is turned on and used.

The electric hoist ten-ton rope guide is installed as follows:

  1. First remove the fixing screws fixed on the rope guide.

  2. Unfold the rope guide, turn the side with the stop on the rope guide outwards, and insert the rope guide into the electric hoist.

  3. Put the wire rope head into the rope guide, adjust the rope guide, and straighten out the winding sequence of the wire rope.

  4. Put the wire rope head into the fixed pile and wedge it tightly with an iron wedge.

  5. Fix the rope guide and install all the fixing screws of the rope guide.

  6. Start the electric hoist and adjust the rope guide. It is the best to ensure that the rope guide can accurately cut off the fire up and down without letting the wire rope slack.

The installation of the rope guide is very simple. When installing, pay attention to the installation firmly.

How to replace and install the electric hoist rope guide of a single beam crane
nach oben
Sortierung ndern:  
Anfang   zurück   weiter   Ende
Seite 1 von 1
Search

powered by carookee.com - eigenes profi-forum kostenlos

Layout © subBlue design